Twelve links, in this order.

The Decision-Centered Construction Project Control Methodology is built around Decision Control Points, or DCPs. A DCP is not a report. It is a decision the project has already agreed must be made when a defined threshold is crossed.

The aim is straightforward. Fewer surprises, and a recorded path from a signal to an action someone owns.

Read it as a chain. Each link exists so the next one can be used. Skip a link and the project is back to a number without an owner.

  1. 01

    Decision

    The choice the project actually has to make.

  2. 02

    Responsible Actor

    The person accountable for making that choice.

  3. 03

    Information needed

    The facts that person must have in hand.

  4. 04

    Source

    Where those facts come from, and who produces them.

  5. 05

    Baseline

    The approved plan the facts are judged against.

  6. 06

    Indicator

    The measure that shows movement toward or away from the baseline.

  7. 07

    Threshold

    The value that turns a measure into a required decision.

  8. 08

    Root Cause

    Why the threshold was crossed, not only that it was.

  9. 09

    Forecast

    What happens to cost, time, or scope if nothing changes.

  10. 10

    Corrective Action

    The specific response the responsible actor commits to.

  11. 11

    Verification

    Whether that action brought the indicator back inside the threshold.

  12. 12

    Lesson Learned

    What the project will do differently on the next cycle.

Operational cycle

How the work moves each period.

The architecture says what a decision contains. The cycle is how the team runs it. Learn feeds the next Capture. The loop does not stop at a report.

Follow the steps in order. After Learn, the next step is Capture. The diagram reads clockwise.

  1. 01

    Capture

    Collect the current field, cost, and schedule data.

  2. 02

    Validate

    Check that the data is complete, current, and consistent.

  3. 03

    Integrate

    Put the validated data on one picture of the project.

  4. 04

    Analyze

    Read performance against the baseline.

  5. 05

    Compare

    Set actuals next to the plan and the thresholds.

  6. 06

    Detect

    Flag every indicator that has crossed a threshold.

  7. 07

    Diagnose

    Find the root cause, not only the symptom.

  8. 08

    Forecast

    Project the effect on cost, time, and the remaining work.

  9. 09

    Decide

    The responsible actor chooses, inside the Decision Control Point.

  10. 10

    Communicate

    Tell the people who must act, in writing.

  11. 11

    Act

    Carry out the corrective action.

  12. 12

    Verify

    Check whether the indicator moved back inside the threshold.

  13. 13

    Learn

    Record what held, and feed it into the next cycle.

Instruments

Tools, tied to a decision.

The method does not replace the instruments a project already trusts. It connects them to a decision, an owner, and a threshold. Pharus works with:

  • LPS

    Last Planner System

    Short-term commitments, and a clear record of why a commitment was missed.

  • EVM

    Earned Value Management

    Cost and schedule performance measured against the approved baseline.

  • CCBM

    Critical Chain Buffer Management

    Buffer consumption as an early signal, before the finish date slips in the open.

  • BIM

    Building information modeling

    Quantities, coordination, and scope context from the model, on projects that have one.

  • Monte Carlo

    Monte Carlo schedule-risk analysis

    A range of finish outcomes, instead of a single date treated as certain.

  • Resources

    Resource optimization

    Crews and constraints lined up with the work the decisions depend on.

  • KPIs

    KPIs and early-warning alerts

    A short set of indicators whose thresholds call a decision, not a dashboard kept for its own sake.

The difference

A metric without a decision is not a control.

Pharus does not sell an isolated schedule or a periodic report. Every metric is tied to a specific decision, the person who owns that decision, and a threshold that triggers action. If a measure is not attached to those three things, it is not yet part of the control set.